The complete technical support of the OCME engineering team, starting with the planning phase,
allows customers to develop their business ideas in the most efficient way.
All the system solutions proposed by OCME take in highest priority, all the key factors that a high valuable line proposal must have:
The high efficiency of individual parts and the absence of accumulation of product on the line, allow eliminating the overspeed between modules, typical of traditional systems; the results is a reduction in maintenance, noise levels and downtime.
The complete control of the product management, both for single bottles and packs, reduces the problems with pressure and allows everything to run smoothly as a unique machine, modulating the speed according to the real production needs.